The Permit Fee Estimator is a quick and easy tool that can provide general information about permits and their potential cost for fees. Additional information related to Utilities permit fees is below. For additional information and to discuss permit fees, contact Permit Processing. 

Utility permits and installation

Water meter installation

 

Drop in/downsize installation

Meter sizeReviewInstallationTotal
3/4 inch$325$455$780
1 inch$325$700$1,025
1-1/2 inch$325$1,325$1,650
2 inch$325$1,550$1,875

 

Full water service

Meter sizeReviewInstallationTotal
3/4 inch$325$2,400$2,725
1 inch$325$3,300$3,625
1-1/2 inch$325$5,550$5,875
2 inch$325$6,250$6,575
3/4 upgrade to 1 inch meter$325$2,000$2,325

Cascade Water Alliance charges

The Cascade Water Alliance adopted a Regional Water Capital Facilities Charge (RCFC) increase in 2021. This charge applies to all new or upsized domestic and irrigation water meters. There are one-time charges due upon application for meter installation or prior to construction approval for meters larger than 2 inches that are contractor installed. Credit is given for removed meters. Stand-alone fire sprinkler connections and meters used to deduct volumes for sewer billing purposes are not counted as Cascade Equivalent Residential Units (CERUs), and no RCFC is imposed because these meters do not increase system demand.

For single-family customers, domestic “combination” meters sized to serve both domestic use and fire protection through installed fire sprinkler systems will be charged based on the meter size required for domestic demand alone, excluding fire protection needs. For RCFC calculation purposes, the meter will be assumed to be one size increment smaller than the installed meter, and any additional capacity required solely for fire flow will not be subject to RCFCs. Reductions of more than one size increment must be supported by additional documentation and are subject to approval. Meter size increases for reasons other than fire protection do not qualify for this adjustment and will be charged based on the full installed meter size.

Once the UC permit is issued, applicants requiring a new meter or service installation by the City will receive additional guidance on how to coordinate the installation process.

Cascade Water Alliance Regional Capital Facilities Charge

Meter SizeCascade Equivalent Residential Units (CERU)2026 Regional Capital Facility Charge (RCFC)
3/4 inch1$8,852
1 inch2.5$22,130
1-1/2 inch5$44,260
2 inch8$70,816
3 inch16$141,632
4 inch25$221,300
6 inch50$442,600
8 inch80$708,160

Side Sewer, Storm Collection and Unit Developer Extension Agreements

For some reviews and inspections, the city charges against the deposit. If the deposit is depleted, customers will receive a monthly bill for any additional hours. The city will refund any remaining deposit balance. Fire Dept. review is billed at $227 per hour. For questions regarding which hours are charged against deposits, please contact your assigned reviewer or Utility Review. 

Side Sewer Permits (UA)
Permit ReviewInspectionTotal
Hourly rates$216$216 
Single family residential$325$432$757
Commercial, multifamily, O/W separator, grease interceptor or any on-site maintenance$432$648$1,080
Single family side sewer repair only$0$216$216
Storm Connection Permits (UB)
PermitReviewInspectionTotal
Hourly rates$216$216 
Single family residential$648$432$1,080
Commercial, multifamily, O/W separator, grease interceptor or any on-site maintenance$648$648$1,296
Unit Developer Extension Agreement (UE)
Permit chargeReviewInspection
Hourly rates$216$216
Utility Department review$4,320$0 deposit
Fire Department review of water design$227$227
Additional fees and charges
  • Water main shutoff charge for work on utility extensions is billed at $216 per hour and $252 per hour for overtime
  • Direct or regional facility charges are billed per ordinance or administrative rule
  • Latecomer administrative fee is 3% of latecomer fee

 

Development Services

450 110th Ave. NE
P.O. Box 90012
Bellevue, WA 98009

Telephone
Hours
In-person Permit Center services are available Monday to Thursday 10 a.m. - 3 p.m.

The Permit Center will be open on Friday from 10 a.m. - 3 p.m., although customers visiting City Hall may be served remotely by permitting staff.
Business Hours
Monday - Friday 8 a.m. to 4 p.m.