This page supplies links to tools that will help you provide all the information needed so city right-of-way staff can review your permit.
The documents below may be referenced in your right of way permit. Applicants are responsible for reviewing and understanding the applicable documents that are referenced in the permit conditions. The documents also are available at the Development Services counter on the first floor of Bellevue City Hall.
- APWA Uniform Color Code Handout
- Electrical Undergrounding Requirements and Variance Request Procedure
- Holiday Lighting Brochure
- Link Light Rail Track Access Requirements
- New Single Family Flowchart
- Over-Legal Vehicles and Loads Policy
- Pedestrian Access During Construction Projects
- ROW Use General Conditions
- ROW Use Permit Inspection Information
- Sidewalk Cafe Standards
- Site Plan Checklist
- Traffic Control Supervisor Roles and Responsibilities
- Traffic Control Guidelines
- Utilities Department ROW Permit Conditions